BS1139 standard galvanized used cuplock scaffolding for sale

FOB Reference Price:Get Latest Price
US $650-1,350 / Tons | 25 Ton/Tons (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Tianjin, China (Mainland)
Brand Name:
ADTO
Model Number:
Scaffolding System
Material:
Steel Q235/Q345
Surface treatment:
Hot Dip Galvanized,painted,self finish
Application:
Building Construction
Thickness:
2.75/3.0/3.2mm
Certificate:
ISO9001:2008,SGS,CE
Standard:
EN74/BS1139/AS1576
Supply Ability
Supply Ability:
5000 Ton/Tons per Month
Packaging & Delivery
Packaging Details
packed in bundle,suitable sea transport.
Port
tianjin,xingang
Lead Time :
30 days after recieve the L/C or deposit

BS1139 standard galvanized used cuplock scaffolding for sale

 

 

Product Description

component:

*Standard(vertical)

*Ledger(horizontal)

*Intermediate transom

*Diagonal brace

*Spigot connector

*Base Screw

*U head screw

*Metal plank or catwalk

 

SIZE

Standard

length(M)weight(KG)
self finishpaintedhot galv.
L=0.502.422.52.57
L=1.004.844.985.13
L=1.306.546.746.93
L=1.507.257.477.69
L=1.808.969.229.49
L=2.009.679.9610.25
L=2.3011.3711.7112.05
L=2.5012.0812.4412.81
L=3.0014.514.9315.37

 

ledger

 

length(M)weight(KG)
self finishpaintedhot galv.
L=0.602.382.452.52
L=0.903.443.553.65
L=1.003.83.914.03
L=1.204.514.654.78
L=1.304.875.015.16
L=1.505.585.755.91
L=1.806.656.857.05
L=2.007.367.587.8
L=2.509.149.419.69

 

 


intermediate transom
 

length(M)weight(KG)
self finishpaintedhot galv.
L=0.603.593.73.8
L=0.904.664.84.93
L=1.005.015.165.31
L=1.205.725.96.07
L=1.306.086.266.44
L=1.807.868.098.33
L=2.008.578.839.08
L=2.5010.510.6610.97
L=3.0012.1312.4612.86

 

NameLengthWeight (Kg)
Self FinishPaintedHot Dip Galv.
Diagonal BraceL=0.60Mt3.593.73.8
Diagonal BraceL= 1.3Mt5.225.375.53
Diagonal BraceL= 1.8Mt7.487.717.93

 

NameLengthWeight (Kg)
Self FinishPaintedHot Dip Galv.
Spigot ConnctorL=0.25Mt0.690.710.73

 

 

 


 

 

 

Company Information

Xiangjia Steel is  a leading manufacturer of BS1139 scaffolding tube, system scaffoldings and accessories, cuplock system,galvanized steel tube,Frames,steel props, metal planks and other related products.

 

• 7 years experience, sales volume reaches 1.5 billion US dollars.
• Good quality control in production process, ISO9001:2008,SGS,BV approved.
• Excellent quality and Competitive price, OEM is available.
• Available in an extensive range of stock or custom size.
• The whole process from material to finished products can be traced.
• Our factory is close to the port-Xingang,Tianjin.  

factory

trade show

CERTIFICATE

 

FAQ

Our Service:
• Your inquiry related to our product & price will be replied within 24hours.
• Well-trained & experienced staff are to answer all your inquiries professional in English of course.
• Working time: 8:00am - 5:30pm, Monday to Friday.
• OEM is highly welcomed. We have strong R&D team here to help.
• Your business relationship with us will be confidential to any third party.
• Good after-sale service offered, please get back if you got question.

 

 

1. Q: What's your MOQ(minimum order quantity)?

 

    A: One full container.

 

2. Q: What's your packing methods?

 

    A: Packed into bundle, and rest in bulk.

 

3. Q: What's your payment terms?

 

    A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.

 

4. Q: What's your delivery time?

 

    A: 10-20 days after received the advance payment or L/C.

 

5. Q: Are you manufacturer or trader?

 

    A: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.

 

6. Q: Where's your factory?

 

    A: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.

 

7. Q: Can we visit your factory?

 

    A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

 

8. Q: Can you supply other scaffolding materials?

 

    A: Yes. All related scaffolding materials.

 

        (1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)

 

        (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500

 

        (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

 

        (4) steel coupler (preesed / drop forged coupler)

 

        (5) steel plank with hooks or without hooks

 

        (6) steel stair case

 

        (7) screw adjustable base jack

 

        (8) Adjustable props

 

 

Main Buying Procedures:
• Enquiry: contact us by email, phone call, fax, Instant tools (Trademanager, MSN, Skype) and let us know your enquiry.
• Discussion: specify the items you want, confirm specification.
• Quotation: Prices offered and accepted.
• Place order as per contract or discussion.
• Proforma invoice offered to double confirm the order for both sides record.
• Payment settled.
• Order completed under our arrangement.
• Goods shipped as per contracted term.
• Goods arrive at local port or warehouse, depending on contracted term.
• Support & re-ordering.

 

 

We also Supply:
BS1139 galvanized scaffolding pipe, Ringlock scaffolding system, Adjustable steel props, Adjustable screw jack,Frame system, Metal plank, Scaffolding coupler& accessories, cuplock scaffolding system etc.