Hot Dip Galvanized Cuplock Scaffolding for Bridge

FOB Reference Price:Get Latest Price
US $950-1,200 / Metric Ton | 25 Metric Ton/Metric Tons (Min. Order)
Supply Ability:
20000 Metric Ton/Metric Tons per Month
Report Suspicious Activity
Quick Details
Place of Origin:
Tianjin, China (Mainland)
Brand Name:
Model Number:
Cuplock Scaffolding
Adto scaffolding
Scaffolding Cuplock System
Surface treatment:
Hot Dip Galvanized
Silver, blue, Green
specifications or customers require
EN 12811-1:2003
structures,tower access
Corrosion Resistance:
15 years lifespan
Packaging & Delivery
Packaging Details
Normal package fit transport
Delivery Time
Shipped in 30 days after payment

Hot Dip Galvanized Cuplock Scaffolding for Bridge


Product Description



Hdg Drop Forged Cuplock Scaffolding, Hdg Drop forged cuplock scaffolding in stock

The biggest scaffolding manufacturer in China with high quality. Why cuplock?

High Standard Process: Q235 ERW, hot-dip galvanized surface enhancing her corrosion resistance; 15 years lifespan.

Multi-functional usage: Adapting to all kinds of construction requirements, especially suitable for the erection of scaffolding and heavy propping.

Quick erection, less time and effort: Maximum standard weight reaches 17.07kg, the erection and disassembly rate 3-5 times faster than the conventional scaffolding.

High capacity load: stable and reliable structure with outstanding performance; the joint connector of cuplock can resist high bending, shearing and torsion, with load capacity 15% more than traditional tubular &fitting scaffolding system.

Safe and reliable: Three-dimension axial force express and structure of the scaffold can create high strength, good stability and perfect auto-lock and meet the requirement of safe construction.
Maintenance &management free-trouble: No loose accessories, complete system easy to manage during construction.








Packaging & Shipping







Company Information




Your questions:

1. Q: What's your MOQ(minimum order quantity)?

   A: One full container.

2. Q: What's your packing methods?

    A: Packed into bundle, and rest in bulk.

3. Q: What's your payment terms?

    A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status. 

4. Q: What's your delivery time?

    A: 10-20 days after received the advance payment or L/C.

5. Q: Are you manufacturer or trader?

    A: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems. 

6. Q: Where's your factory?

  A: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.

7. Q: Can we visit your factory?

 A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

8. Q: Can you supply other scaffolding materials?

    A: Yes. All related scaffolding materials.

        (1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)

        (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500

        (3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)

        (4) steel coupler (preesed / drop forged coupler)

        (5) steel plank with hooks or without hooks

       (6) steel staircases

        (7) screw adjustable base jack

        (8) Adjustable props